From the first flow chart drawn by the designer to the code written by the engineer, after a large number of virtual and real simulations, laboratory and real environment tests, to the manufacture and delivery of products, quality and reliability are deeply embedded in everything we do, so each controller will undergo many static and dynamic tests after assembly, and at the beginning of each production cycle, technicians will randomly and massively sample the products on the production line, and do complete tests on them (noise resistance test, environmental test, Control performance testing...) to ensure that the performance meets the customer's expectations.
The first flow chart drawn by the designer.
The code written by the engineer.
A large number of virtual and real simulations, laboratory and real environment tests.
The manufacture and delivery of products.